Basic initialization

<< Click to Display Table of Contents >>

Navigation:  Hardware Overview > Sensors and Probes > PCD-S >

Basic initialization

Installation and initial operation

Zero point compensation PCD-S-Mxx:

oFor maximum accuracy, Rotronic recommends strongly to perform a zero point compensation after the installation and initial operation: Customer adjustment.

 

Differential pressure connectors:

oTypically pipes of 4 mm internal diameter are used.