Basic initialization

<< Click to Display Table of Contents >>

Navigation:  Humidity & Temperature Devices > Probes > HC2A-S/XX (S, SH, SM, S-HH) >

Basic initialization

Electrical installation

Heavy machinery and instrumentation should not share the same power supply wiring. If this cannot be avoided, noise filters and surge protectors should be used. Most UPS devices have those features already integrated.

 

 

 

Operation

The HC2A probes are compatible with a large number of indicators, data loggers and transmitters from ROTRONIC. Operating instructions are provided in each device manual. The HC2A probes can also be used as a conventional analog probe, see Cables. Use the HygroSoft software and the AC3001 to configure the probe as desired, complete the mechanical and electrical installation and power up the probe.