Wall Mount Modules include:

1.RMS-GW-868/915.

2.RMS-LOG-L/868/915.

3.RMS-LOG-T30-L/868/915.

4.RMS-D-L.

 

Step 1

unpack GW 1

Step 2

unpack GW 2

Step 3

unpack GW 3

 

unpack GW 12

 

Package contents:

1 * Wall mount module, including back plate.

1 * Short User Manual.

1 * Final Test Certificate.

1 * Mounting kit (2 screws and wall fixings, joints, power connector to use with the RMS-PS, jeweler screwdriver, velcro). When ordering an RMS-LOG-T30-L/868/915 additional connectors for the Pt100's as well as cable glands are also included.

2 * RMS-BAT batteries (not included with the RMS-GW or the RMS-D-L).

1 * Name / Calibration Date Stickers.

Step 4

The RMS-BAT batteries should already be mounted in the module when included:

unpack GW 8

 

To do:

Remove the yellow tag to enable the battery power.

Step 5

IMPORTANT: Before attaching the power supplies or measurement probes pull the necessary cables through the mounting plate with the necessary joints in place:

unpack GW 11

Step 6

For PoE installations:

unpack GW 4

 

Setup:

1) Plug the RJ45 Ethernet cable into the wall mount module.

2) Plug the other end of the RJ45 Ethernet cable to the PoE switch/network.

Step 7

For PoE injector installations:

unpack GW 5

 

Setup:

1) Plug the RJ45 Ethernet cable into the PoE injector network input.

2) Plug the other end of the RJ45 Ethernet cable to the network.

3) Plug the second RJ45 Ethernet cable into the PoE injector device input.

4) Plug the other end of the second RJ45 Ethernet cable to the wall mount module.

3) Plug the power supply into the PoE injector.

4) Plug the power supply into a power source.

Step 8

For 24VDC installations (can also be combined with a PoE network):

unpack GW 6

 

unpack GW 7

 

Setup:

1) Plug the RJ45 Ethernet cable into the wall mount module.

2) Plug the other end of the RJ45 Ethernet cable to the network.

3) Plug the power supply into the wall mount module, pins 1 and 2.

4) Plug the power supply into a power source.

Step 9

For wall mount modules (RMS-LOG-L/868/915) with digital probes (HCD, PCD, CCD):

unpack GW 9

 

To do:

Align the connector and manually screw in the probe ensuring that the nut is tight.

Step 10

For wall mount modules (RMS-LOG-T30-L/868/915) with Pt100 connectors (for T30-xxxx probes):

unpack GW 10

 

To do: